Services

Site investigation and contaminated land services.

Site investigation reports for planning permission, Phase 1 desk studies and Phase 2 investigations, through to detailed risk assessment, remediation and verification. Specialist services include groundwater DQRA, ground gas and mine gas risk assessment, vapour intrusion assessment and EASR soil and groundwater monitoring support. Interra supports consultancy teams, developers and permit operators across Scotland and the wider UK.

Illustration of contaminated land investigation, groundwater monitoring and remediation

Contaminated land assessment & planning support

Site investigation reports and contaminated land assessments in line with BS 10175 and BS 5930 to support planning applications and the discharge of planning conditions. Interra can manage the work from initial desk study through investigation, assessment, remediation and verification, coordinating contractors and laboratories where required. Work follows the risk-based approach set out in LCRM, taking account of applicable regulatory and local authority requirements.

  • Phase 1 desk study
  • Preliminary risk assessment
  • Conceptual site model development
  • Phase 2 intrusive site investigation & reporting
  • Site-specific contaminated land risk assessment
  • Remediation strategy & verification reports
  • Planning condition support & council liaison
Illustration of groundwater contamination and gas and vapour pathways towards a building

Specialist risk assessment

Focused work where the conceptual site model identifies complex groundwater, mine gas or vapour pathways that require specialist assessment.

  • Human health risk assessment
  • Groundwater & water environment risk assessment
  • Ground gas & mine gas risk assessment
  • Vapour intrusion assessment
  • Detailed quantitative risk assessment (DQRA)
Illustration of an industrial site with monitoring wells and a soil and groundwater report

EASR permit support

Regulatory support through the EASR permit lifecycle, including preparation and review of site and baseline reports and soil and groundwater monitoring plans in accordance with SEPA IND-G-012 & IND-G-013.

  • Baseline reports
  • Soil & groundwater monitoring plans
  • Site condition reports
  • Site closure & permit surrender support
  • SEPA liaison & technical response
Illustration of technical report review and quality assurance

Technical assistance

Experienced technical assistance for consultancies, developers and project teams requiring clear reporting, independent advice or additional specialist resource.

  • Technical report preparation
  • Independent review & quality assurance
  • Peer review
  • Complex data interpretation
  • Additional resource
Planning conditions explained

What does your site investigation report need to cover?

The scope depends on the wording of your planning condition, previous investigations, the site's history and the proposed use. Interra can review these together and identify the work needed for your submission.

Phase 1 desk study and risk assessment

A review of historical land uses, environmental information and site observations develops the conceptual site model and identifies potential pollution linkages. This establishes whether further investigation is needed.

Phase 2 site investigation report

Where required, targeted intrusive investigation, sampling and monitoring characterise soil, groundwater and gas conditions. The report interprets the findings and assesses relevant risks to people, buildings and the water environment.

Remediation strategy and verification

If unacceptable risks are identified, a remediation strategy sets out the measures and evidence needed. Verification reporting then records the work undertaken to demonstrate that the agreed requirements have been met.

A condition requiring a comprehensive investigation may need more than a desk study. Approval stages and the timing of remediation and verification vary between permissions, including phased developments.

Discuss your planning condition or existing reports
Project enquiries

Need support with a contaminated land or regulatory requirement?

Discuss your project